Rehab Estimate
By Moe Ameen, founder of BILT · Published · Updated
A rehab estimate is a line-item forecast of the repairs needed to bring a property to resale or rental condition, including materials, labor, permits and a contingency.
Key takeaways
- Estimate by line item, then add a contingency for hidden problems.
- Pre-1978 homes need EPA lead-safe certified renovators, which affects bids and timelines.
- The rehab budget and ARV must describe the same finish level.
A rehab estimate goes room by room and system by system: roof, HVAC, plumbing, electrical, foundation, kitchen, baths, flooring, paint, exterior. Each line gets a cost, then a contingency on top for what the walls hide.
Older homes add a compliance line. EPA's Renovation, Repair and Painting Rule requires anyone paid to disturb painted surfaces in homes built before 1978 to be certified and follow lead-safe practices, and EPA says the rule covers people who buy, renovate and sell homes for profit.
How do you build a rehab estimate?
Walk the property with a checklist, price each item from contractor bids or your own cost history, then add permits and a contingency.
Order the walk by risk: structure, roof, water, electrical, HVAC, then finishes. Fannie Mae's appraisal rules treat items that affect safety, soundness or structural integrity as ones that must be completed, which is a useful way to separate must-fix lines from cosmetic ones.
What does a rehab estimate look like?
Illustrative numbers: a 1,400 sq ft 1965 house needing a roof, kitchen, two baths, flooring and paint estimates near $58,000 with a 15% contingency.
Because the house is pre-1978, the paint and window work must be done by an EPA-certified firm, which can raise those bids.
| Item | Estimate (illustrative) |
|---|---|
| Roof | $11,000 |
| Kitchen | $14,000 |
| Two baths | $10,000 |
| Flooring | $6,500 |
| Interior and exterior paint (lead-safe) | $6,000 |
| Permits and dumpsters | $2,900 |
| Subtotal | $50,400 |
| Contingency 15% | $7,560 |
| Total | $57,960 |
Why do rehab budgets run over?
Skipping the contingency, guessing on systems you did not inspect, and ignoring lead and permit rules are the mistakes that blow budgets.
Get a sewer scope or roof inspection when the age suggests it. A $400 inspection beats a $15,000 surprise discovered mid-rehab.
Who is this for, and who should skip it?
Best for
- Investors who can walk the house and price each item from bids or past jobs
- Keeping the repair budget at the same finish level the ARV assumes
Not ideal for
- A budget with no contingency for what's behind the walls
- Guessing at roofs, plumbing or wiring you never inspected
What else do people ask?
How big should my contingency be?
Set it from your own cost overruns on past jobs, and go larger on older homes and full guts than on cosmetic work.
Do I need permits for a flip?
Usually for structural, electrical, plumbing and HVAC work. Check your city's building department.
Does the lead rule apply if I do the work myself?
EPA says the rule generally does not cover homeowners working on their own home, but it does cover people who buy, renovate and sell for profit.
Should end buyers trust a wholesaler's rehab estimate?
Treat it as a starting point and walk the property yourself.
How do we know this?
We read EPA's RRP program page and Fannie Mae's Selling Guide B4-1.3-06 on property condition on November 4, 2026; costs are illustrative.
Sources
- EPA: Lead Renovation, Repair and Painting Program (accessed November 4, 2026)
- Fannie Mae Selling Guide B4-1.3-06, Property Condition and Quality of Construction (accessed November 4, 2026)
Related terms